01 / 04
The monumental entrance to the Mont Cenis rail tunnel
Datas de abertura
Closed temporarily.
Idioma(s) falado(s): French
Animais de estimação permitidos: Non
Número máximo de pessoas: 60
Meios de pagamento aceitos
Bank/credit card
Cash
Preços
Free entry for children under 15.
Built when the first tunnel through the Alps was cut (1857-1871), the monument is enhanced with a life-sized model steam train and carriages and offers a permanent exhibition recording the history of the tunnel and its subsequent impact…
The Fréjus railway tunnel, the first major Alpine breakthrough (12.5 km), was built by the Piedmontese authorities.
Serviços
Instalações
Car park
Coach parking
Private parking
1/4














