Pont Carnot
Datas de abertura
All year round, daily.
Idioma(s) falado(s): French
Animais de estimação permitidos: Oui
Preços
Free access.
The project and the execution of the works were carried out by Sadi Carnot, then engineer of the Bridges and Roads of Haute-Savoie before meeting a political destiny which would lead him on to the Presidency of the French Republic, which is where the name originates from.
The construction of this spot - made with cut stone at the heights of Le Vuache, at the place known as "la Forge", began in 1868 to be completed in 1873 due to the war of 1870. It has two particularities: a large arch to resist the violence of the floods of the Rhône and two divisions, imposed by the Ministry of War, in order to allow a limited destruction of the bridge in the event of hostilities.
Serviços
Serviços
Pets welcome
Instalações
Parking nearby










