01 / 04
The monumental entrance to the Mont Cenis rail tunnel
Fechas de apertura
Cerrado temporalmente.
Idioma(s) hablado(s): Francés
Se admiten animales: Non
Número máximo de personas: 60
Medios de pago aceptados
Tarjeta bancaria/crédito
Metálico
Precios
Gratuito para los niños menores de 15 años.
Built when the first tunnel through the Alps was cut (1857-1871), the monument is enhanced with a life-sized model steam train and carriages and offers a permanent exhibition recording the history of the tunnel and its subsequent impact…
The Fréjus railway tunnel, the first major Alpine breakthrough (12.5 km), was built by the Piedmontese authorities.
Servicios
Instalaciones
Aparcamiento
Aparcamiento de autocares
Aparcamiento privado
1/4














